200 kWh on the Ostalb
The first system from the kit is being built right now on a large farm in the Ostalb region of southern Germany. Commissioning: spring 2027.
More own power, fewer load peaks
The pilot system runs on a large farm in the Ostalb region. It stores solar power that is not needed during the day and releases it when the farm needs it. At the same time, it caps load peaks and relieves the grid connection.
For Jung Batterietechnik the pilot is the real-world test of the kit: its operating data feeds straight into the analysis software and into the next, larger systems.
It is built with Swabian thoroughness, to VDE guidelines and together with regional specialist partners.

From concept to a running system
-
Stage 1 completed
Analysis and sizing
Load and generation of the farm analysed, system size and operating strategy defined.
-
Stage 2 in progress
Construction
The system is being assembled. Photos of the progress will follow here.
-
Stage 3 spring 2027
Commissioning
Grid connection, testing and commissioning with specialist partners, planned for spring 2027.
-
Stage 4
Operation and evaluation
Operating data shows what the system delivers and feeds into the next systems, up to the megawatt-hour range.